Optimizing Highrise Construction: Mickelo’s DRAG’N Solution Drives Efficiency to New Heights
This project aimed to install a capillary break with 5/8- aggregate to prepare a slab for a high-rise building. The General Contractor (GC) initially employed two slinger trucks to execute the work. However, their maximum daily production was limited to six loads each day per truck, causing the project to fall behind schedule. Challenges Faced: …